New Discussions about Rail Connection from Finland to Kirkenes

Deutsch

Some activity can be observed concerning the question of a railroad connection from northern Finland to Kirkenes in Norway.

Such a railroad would start in Rovanienmi or Kemijärvi and go to Ivalo in northern Finland. From there it would pass the Lake Inari (Inarijärvi) either like todays highway in the west or a bit shorter in the east and lead to Kirkenes at the Russian Norwegian border and the Barents Sea.

Kirkenes has a good port that usually remains ice-less throughout the winter because of the Gulf Stream. It is the eastern end point of the Hurtigruten and there is currently the only road crossing the border from Norway to Russia. Kirkenes can currently only be reached from the land side only by road or by the Kirkenes–Bjørnevatn Line, a railroad that connects the port a a mine just 8.5 kilometers south. It is used mainly for transport of iron ore, depending on the activity of the mine and the world market prices of iron ore.

It seems to be reasonable to expand the port of Kirkenes. The new capacities could be offered to Finland and Russia. Discussions of connecting to Nikel (Никель) in Russia have been slowed down by Russia in an effort to support the port of Murmansk (Мурманск). But the project of connecting to Finland, even though about ten times as far, is being seriously considered. This would allow Finland easier access to the world makets, especially for transatlantic trade. In addition the route will gain importance due to the global warming, which is already making the Northeast passage north of Sibiria a more reasonable route to eastern Asia. It is shorter and cheaper than going via the Suez Canal, but the effect of global warming is still not so strong that this has become the main route. If such a rail connection to Finland existed, it would be possible to use Kirkenes also as port for parts of Russian and Central Europe including the Baltic States both to Asia and the Americas, by just using railroad connections between Finland and Russia that already exist. Finland and Russia both use a broad gauge of 1524 mm or 1520 mm, respectively, that is similar enough to allow usage of both gauges by the same freight trains.

The short line near Kirkenes could be converted to broad gauge or to dual gauge or a new track could be built parallel to it. It would be necessary to build about 550 km of track. Probably road transport could profit also, if the shorter route east of Lake Inari were chosen, because it is likely that a highway parallel to the railroad would close the 20 km long gap between the Finnish and Norwegian highway networks east of Lake Inari.

The shorter connection to Skibotn that was discussed earlier, seems to be irrelevant now. Of course, Skibotn does not have a serious port, which would have to be built, possibly causing some resistance and for sure costing a lot of money. The railroad could also be extended to Tromsø, but that would make it longer anyway and I have not heard of easy expansion options of the port of Tromsø.

Sometimes in Finland it is suggested to build a Tunnel from Finland to Estonia as well to connect to Europe. But I do not see this as a requirement, since the potential of freight transport would anyway come mostly from Finland. Other parts of Europe are already today be connected by train via ferries from Estonia to Finland or without ferries via Russia or via Sweden. One break of gauge will be in the route anyway.

Currently a feasibility study concerning the railroad connection from Finland to Kirkenes is being performed. Sometimes the term „Arctic Ocean Line“ is used for this project. I would assume that we are talking about an electrified single track railroad with short double track sections. The decision is supposed to be made in 2019. This inspires discussions like this article. We will see were this will lead. I am in favor of the project.

Map

Map of likely and possible routes (red):

Arctic Rail Routes

Arctic Rail Routes


Source Wikimedia Commons Creator RicHarc-59 (C) CC-BY-SA-3.0

Links

Share Button

Neue Diskussion über Bahnstrecke von Finnland nach Kirkenes

English

Es hat wieder etwas Bewegung in der Frage einer Bahnstrecke von Finnland nach Kirkenes gegeben.

So eine Bahnstrecke würde von Rovaniemi oder Kemijärvi nach Ivalo und von dort östlich oder westlich am Inarisee vorbei nach Kirkenes führen.

Kirkenes hat schon einen gut funktionierenden Hafen, der wegen des Golfstroms normalerweise eisfrei bleibt. Der Hafen ist Endstation der Hurtigroute und liegt an der Grenze zu Russland. Er ist zur Zeit nur auf der Straße oder über die 8 km lange Bahnstrecke zu einer Erzmine erreichbar und dient zu einem großen Teil dem Export von Erz. Es gibt aber die Möglichkeit, diesen Hafen zu erweitern. Einerseits ist das für Finnland eine Möglichkeit, besser per Schiff an die Weltmärkte angebunden zu werden, insbesondere für den Transatlantikverkehr. Diese Rolle wird wegen der Klimaerwärmung noch an Bedeutung gewinnen, weil man verstärkt die Nordostpassage nördlich von Sibirien als Route nach Ostasien nutzen kann. Dies ist kürzer und damit billiger als über den Suezkanal, wenn auch der Effekt durch die Klimaerwärmung noch nicht so stark ist, dass es zur Hauptroute geworden wäre. Andererseits könnte Kirkenes auch als Hafen für Teile von Russland und Mitteleuropa genutzt werden, wenn man grenzüberschreitende Bahnstrecken von Russland nach Finnland nutzt. Finnland und Russland benutzten beide eine Breitspur, die sich nur um wenige Millimeter unterscheidet und grenzüberschreitenden Verkehr ohne Umspuren ermöglicht.

Die kurze Bahnstrecke bei Kirkenes würde man wahrscheinlich auf Breitspur umbauen oder parallel dazu neu bauen. Insgesamt wären etwa 550 km Strecke zu bauen. Der Straßenverkehr könnte übrigens eventuell von einer neuen Straße zwischen dem Inarisee und der Russischen Grenze profitieren, die Kirkenes auch direkter mit Finnland verbindet, wenn diese Route für die Bahn gewählt würde. Davon ist nicht die Rede, aber es ist zu vermuten, dass man das Projekt dann auch umsetzen würde.

Wie es aussieht, ist die etwas kürzere Verbindung nach Skibotn, die früher auch mal im Gespräch war, nicht mehr relevant. Allerdings müsste man in Skibotn einen Hafen komplett neu bauen oder die Strecke doch bis Tromsø verlängern, was dann nicht mehr kürzer wäre.

Im Moment geht es konkret um eine Machbarkeitsstudie für diese Bahnverbindung. Entschieden wird erst etwa 2019. Das inspiriert natürlich entsprechende Diskussionen wie auch diesen Beitrag. Wir werden sehen, was daraus wird. Es ist ein Bahnprojekt, dass vor allem für den Güterverkehr nützlich ist. Die beteiligten Länder würden profitieren und es würde Verkehr mit der Bahn durchgeführt, der auch mit weniger umweltfreundlichen Verkehrsmittel abgewickelt werden könnte. Ich sehe das Projekt deshalb auf jeden Fall positiv.

Karte

Karte möglicher und wahrscheinlicher Routen (rot):

Arctic Rail Routes

Arctic Rail Routes


Quelle Wikimedia Commons Urheber RicHarc-59 (C) CC-BY-SA-3.0

Links

Share Button

Rail Projects in Northern Scandinavia

Deutsch

The European region north of the arctic circle in Finland, Norway and Sweden is often called „Cap of the North“ („Nordkalotten“ in Danish, Norwegian and Swedish, or „Pohjoiskalotti“ in Finnish). That area is thinly populated, but there are some towns with a few 10’000 inhabitants and a more densely populated area in their vicinity, like Tromsø, Narvik, Alta, Harstad and Kiruna. I don’t want to take the arctic circle as a hard boundary, but rather write about rail projects in the north of these three countries, at least those I have heard of. Railroad construction in this area is mainly motivated by freight traffic. The Iron Ore Line from Narvik to Kiruna has been built to access the huge iron ore deposits in northern Sweden, mostly Kiruna. Now northern Sweden contains further iron ore deposits and also in northern Finland a lot of mining, mostly for iron ore, could be possible. Finland has already been called the „new Australia“ because of that. Even northern Norway contains some smaller share of iron ore deposits, mostly in the area of Kirkenes near the Russian border. This mine is the reason for the northernmost railroad in Norway connecting the sea port of Kirkenes with the mine, being just a few kilometers long. Because of declining profitability mine and railroad had already been closed down, but because of increasing demand and increasing prices for iron ore, they have been reopened.

The railroad to Narvik does not have any connection to the remaining Norwegian railroad network via Norway. The Nordland Line is running from Trondheim to Bodø. Bodø is situated pretty much half way through the whole country, between the Swedish border in the south in Svinesund and Grense Jakobselv at the Russian border in the northeast. Since the 1920es plans have existed to build this railroad line, but not only to Bodø, but also the Polar Line to Kirkenes and Vadsø in the northeast. During the second world war the construction of these lines was accelerated, which resulted in parts of the line from Trondheim to Bodø being built, even though the whole line was opened in 1962. North of Fauske and Bodø to Narvik some tunnels, bridges and railroad dams have been built, some which have been incorporated into the highway E6. Today a railroad to Kirkenes and Vadsø can no longer be considered reasonable, because the train would no longer be the only means of transport, since the area has been well equipped with highways, ports and airports. The number of inhabitants is too low to justify daily passenger trains in a situation where other means of transport exist. Even freight traffic is covered well by ships and trucks in this relation. The part of northern Norway north of Tromsø has so little population, that its contribution to air pollution created by Norway is not very significant.

Another question is the extension of the Nordland Line from Fauske to Narvik, Harstad and Tromsø. In this case a railroad from Trondheim to Tromsø with branches to Bodø, Narvik and Harstad could be imagined. This is a project that is discussed in Norway every couple of years, but it does not seem to have priority. Connecting towns and cities with somewhat more significant population this could provide potential for running freight and passenger trains several times per day with an acceptable number of passenger and acceptable amount of freight. A problem is the Tysfjord, which cannot easily be crossed or bypassed. In spite of almost unlimited resources for highway construction it has not been possible to build a ferry free section of the highway E6 between Fauske and Narvik. For a railroad three scenarios could be considered:

  • Ferry Line: The railroad leads to the fjord, probably to Drag, and is trajected by a railroad ferry, going to Narvik and Lødingen. This would allow for integration of Harstad, but the ferry would probably make the rail connection too unattractive to compete with highway, ship and air transport. So this variant will probably no longer be considered, if the line is ever built.
  • Fjord Line: The railroad follows the eastern shore of Tysfjord, with many tunnels.
  • Mountain Line: The railroad runs near the Swedish border across the mountain range, intersecting with the Iron Ore Line from Kiruna to Narvik near Bjørnfjell, this allowing for a branch to Narvik by just providing a connection.

More concrete than this are connections from the coast inland. Finland has lost its ice free port in Petsamo in the Arctic Sea during the second world war. It is no longer such a big deal because ice breakers have become more of an option, allowing even otherwise frozen ports in the Baltic Sea to stay open during the winter. The relationship between Norway and Finland is now good and Norwegian ports can be used by Finish companies. But trucks are not very useful for transporting huge quantities of iron ore. Such plans do exist for accessing a new mine near Pajala in northern Sweden using 90 ton trucks between the mine and the next railroad connection in Svappavara. It has even been authorized. But there are downsides. The highway and the bridges will be used up in as little as five years and the houses near the highway will need triple glass in an area where there were just a few cars per hour. There will be a 90 ton truck every two minutes, day and night. In the long run a railroad might be a better solution. In principle several options exist for connecting the new iron ore mining areas in northern Finland and Sweden with the sea ports that have been discussed recently:

  • Connections to the south via the existing railroad network to the south to Swedish and Finish ports (Kemi, Oulu, Luleå,…)
  • Connections going south or east via the Finish railroad network to Russia.k
  • Construction of a new railroad line from Pajala and northern Finalnd to Skibotn in Norway.
  • Construction of a new railroad line from Pajala and northern Finalnd to Kirkenes in Norway.
  • Construction of a new railroad line from Pajala and northern Finalnd to Svappavara.

It needs to be considered that Finland and Russia are using broad gauge (1520 mm in Russia, 1524 mm in Finland), while Sweden and Norway are using standard auge (1435 mm). While the difference between Russia and Finland is within the tolerance, having to change the track gauge is a hardly acceptable obstacle for freight traffic. The Iron Ore Line from Kiruna to Narvik is already quite congested, so there is not really much spare capacity for providing connections to other mines. But its capacity is extended to some extent by providing more and longer two track sections for allowing trains to meet and by improving the track bed for allowing higher axle loads of 30 tons.

Skibotn is a village with 700 inhabitants having just a small boat harbor. A port for huge sea ships could be built there, but it would be completely new. Also the slope from there to Finland is quite steep making it quite expensive, but still possible to build a railroad. Being in Skibotn in 2012 I have been told that this connection is no longer seriously considered.

Kirkenes already has the rail line for the first few kilometers, but in 1435 mm, which would have to be converted to 1524 mm. If the line is built, it will have to pass Lake Inari in the east or in the west. Kirkenes already has a sea port with options for extending its capacity. Other than Skibotn, Kirkenes might have some potential for passenger traffic, maybe for one or two daily trains, one during the day and one during the night. Because it is the northeastern end of the Hurtigruten it is a relevant tourist destination. Considerations exist also to connect Kirkenes to the Russian railroad network, but they are much less concrete than connecting to Finland, even though the route is much shorter.

Already south of the arctic circle it is worth mentioning that a new railroad line from Boden to Happaranda has been opened in 2012 running parallel to the shore of the Baltic Sea and shortening the trackage significantly. A huge drawback of the Swedish railroad network north of Sundsvall is that the trunk railroad lines have been built far away from the coast for military strategic reasons, leaving the connection of the major towns and cities which are near the coast to branch lines. This is no longer very competitive in these days. This has been fixed to some extent by the Bothnia Line running from Sundsvall to Umeå somewhat near the coast. This is a mostly single track high speed railroad line opened in 2010. An extension from Umeå to Luleå (near Boden) is considered as North Bothnia Line.

Links

Share Button

Bahnprojekte in Nordskandinavien

English

Die Region nördlich des Polarkreises in Finnland, Norwegen und Schweden wird oft Nordkalotte genannt. Die Region ist überwiegend recht dünn besiedelt, allerdings gibt es doch einige Orte mit jeweils einigen 10’000 Einwohnern und einem etwas dichter besiedelten Umland, z.B. Tromsø, Narvik, Alta, Harstad und Kiruna. Ich möchte hier nicht den Polarkreis als harte Grenze nehmen, aber doch etwas über Bahnprojekte im Norden dieser drei Länder schreiben, worüber ich Kenntnis erlangt habe. Motivation für Bahnbau in dieser Region war und ist hauptsächlich der Güterverkehr. So wurde die Erzbahn von Luleå an der nordschwedischen Ostseeküste (aber schon südlich des Polarkreises) nach Narvik in Norwegen gebaut, um die riesigen Erzvorkommen in Nordschweden, vor allem in Kiruna, abbauen, transportieren und verkaufen zu können. Nun gibt es in Nordschweden außer bei Kiruna noch weitere Erzvorkommen. Auch Finnland scheint viele große Erzlagerstätten im Norden zu haben und wurde deshalb schon auf manchen Webseiten als das „neue Australien“ bezeichnet. Und in Nordnorwegen findet sich auch noch die eine oder andere Lagerstätte, vor allem bei Kirkenes in der Nähe der norwegisch-russischen Grenze. Diese Mine ist Grund für die nördlichste Bahnstrecke in Norwegen, die nur ein paar Kilometer bis zum Hafen von Kirkenes verläuft. Wegen sinkender Rentabilität war die Mine und die Bahnstrecke schon stillgelegt worden, aber heute ist die Nachfrage nach Eisenerz auf dem Weltmarkt so gestiegen, dass sich eine Wiederinbetriebnahme anscheinend gelohnt hat.

Die Bahnstrecke nach Narvik ist auf norwegischer Seite nicht mit dem restlichen Bahnnetz des Landes verbunden. Die Nordlandbahn verläuft von Trondheim nach Bodø, das recht genau in der Mitte von Norwegen liegt, wenn man es der Länge nach von der schwedischen Grenze südlich von Oslo bis zu russischen Grenze östlich von Kirkenes durchfährt. Nun gab es in den 20er Jahren Pläne, diese Bahn überhaupt zu bauen und zwar nicht nur bis Bodø, sondern auch die Polarbahn bis Kirkenes und Vadsø ganz im Nordosten des Landes. Im zweiten Weltkrieg ist der Bau dieser Strecke beschleunigt worden und Teile der heutigen Strecke bis Bodø entstanden dabei, auch wenn sie erst 1962 fertiggestellt wurde. Weiter nördlich in Richtung Narvik entstanden schon Tunnel, Brücken und Trassierungen, die zum Teil später in den Bau der Europastraße integriert wurden. Heute kann eine Bahnstrecke durch Norwegen bis nach Kirkenes und Vadsø nicht mehr als realistisch angesehen werden, weil die Gegend inzwischen sehr gut mit Straßen, Häfen und sogar ein paar Flugplätzen erschlossen ist. Die Einwohnerzahl ist zu klein, um in einer Situation, wo die Bahn nicht das einzige Verkehrsmittel ist, täglich verkehrende Züge zu füllen. Und für den Güterverkehr parallel zur Küste reichen Schifffahrt und Lastwagen wohl auch aus. Wegen der geringen Einwohnerzahl trägt der Teil von Norwegen, der nordöstlich von Tromsø liegt, auch nur zu einem kleinen Teil der verkehrbedingten Luftverschmutzung des Landes bei.

Eine andere Frage ist eine Verlängerung der Nordlandbahn von Fauske nach Narvik, Harstad und Tromsø. In dem Fall gäbe es wohl eine Bahnstrecke von Trondheim nach Tromsø, mit Verbindungen nach Bodø, Narvik und Harstad. Dieses Projekt wird in Norwegen immer wieder einmal diskutiert, scheint aber keinerlei Priorität zu genießen. Da man in diesem Fall mittelgroße Städte anbinden würde, wäre sicher das Potential vorhanden, um mehrmals täglich sowohl Güterzüge als auch Reisezüge mit einer akzeptablen Auslastung fahren zu lassen. Problematisch ist jedoch, dass zwischen Fauske und Narvik der Tysfjord im Weg ist. Trotz fast unbegrenzter Ressourcen für den Straßenbau hat man es dort noch nicht geschafft, die E6 fährenfrei zu machen. Für die Bahnstrecke gibt es im Prinzip drei Szenarien:

  • Fährroute: Die Bahnstrecke wird zum Tysfjord geführt, wahrscheinlich nach Drag, und mit einer Eisenbahnfähre übergesetzt. Man könnte dabei wahlweise nach Narvik und nach Lødingen fahren und hätte so auch die Möglichkeit, Harstad anzubinden. Nachteil ist aber, dass eine Bahnstrecke mit Fähre zu unattraktiv ist, um mit dem Straßen-, Luft- und Schiffsverkehr konkurrieren zu können. Diese Variante ist wohl auch nicht mehr vorgesehen, falls überhaupt etwas gebaut wird.
  • Fjordroute: Die Bahnstrecke verläuft am östlichen Ufer des Tysfjords, mit einem hohen Tunnelanteil.
  • Bergroute: Die Bahnstrecke verläuft in der Nähe der schwedischen Grenze über die Berge. Bei Bjørnfjell wird die Strecke von Luleå und Kiruna nach Narvik gekreuzt und damit eine Anbindung von Narvik ermöglicht.

Konkreter ist im Moment aber das Interesse an Bahnverbindungen vom Hinterland zur Küste. Vor allem Finnland hat nach dem Verlust von Petsamo östlich von Kirkenes im zweiten Weltkrieg keinen eigenen eisfreien Hafen mehr. Das ist heute kein großes Problem mehr, weil es sehr gute Eisbrecher gibt, die auch in Häfen der nördlichen Ostsee einen ganzjährigen Betrieb ermöglichen sollen und weil das Verhältnis zwischen Finnland und Norwegen heute gut ist und problemlos norwegische Häfen benutzt werden könnten. Nun eignen sich Lastwagen nicht sehr gut für den Transport großer Mengen Erz. Es gibt wohl derartige Pläne, eine neue Erzgrube bei Pajala in Nordschweden mit 90-Tonnen-Lastwagen an die nächste geeignete Bahnstrecke in Svappavara anzubinden. Das ist wohl schon genehmigt. Nachteil ist aber, dass die Straße und die Brücken bei dieser Belastung in etwa 5 Jahren aufgebraucht sind. Orte, wo es sehr ruhig zu ging und wo nur wenige Autos pro Stunde durchfuhren, brauchen jetzt gute dreifach verglaste Lärmschutzfenster, weil da Tag und Nacht alle 2 Minuten ein 90-Tonnen-Lastzug durchfahren wird. Auf längere Sicht wird hier wohl eine Bahnstrecke die bessere Lösung sein. Im Prinzip gibt es mehrere Möglichkeiten, diese nordschwedischen und nordfinnischen Erzregionen an Bahnstrecken anzubinden, die auch alle in den letzten Jahren diskutiert wurden:

  • Verbindungen nach Süden an das vorhandene Bahnnetz zu den schwedischen und finnischen Ostseehäfen (Kemi, Oulu, Luleå,…)
  • Verbindungen nach Süden oder Osten über das finnische Bahnnetz nach Russland
  • Verbindung von Nordfinnland und Pajala mit Svappavara und damit der Bahnstrecke nach Narvik
  • Neubau einer Bahnstrecke von Pajala und Nordfinnland nach Skibotn in Norwegen
  • Neubau einer Bahnstrecke von Pajala und Nordfinnland nach Kirkenes

Zu beachten ist dabei noch, dass Finnland und Russland Breitspur (1520 mm in Russland, 1524 mm in Finnland) verwenden, während Schweden und Norwegen die Normalspur (1435 mm) einsetzen. Während die 4 mm Unterschied zwischen Russland und Finnland noch im Rahmen der Toleranz liegen, ist für einen größeren Güterverkehr ein Spurwechsel ein kaum akzeptables Hindernis. Erschwerend kommt hinzu, dass die Strecke von Kiruna nach Narvik zur Zeit schon recht gut ausgelastet ist und nur begrenzt zusätzliche Verkehre aufnehmen kann. Sie wird allerdings punktuell ausgebaut, vor allem entstehen mehr Ausweichstellen oder diese werden verlängert, und es werden Anpassungen für höhere Achslasten von 30 Tonnen ermöglicht werden.

Skibotn ist ein Ort mit 700 Einwohnern, der heute nur einen Bootshafen hat. Es ließe sich dort sicher ein Hafen für Großschiffe bauen, aber das wäre ein kompletter Neubau. Außerdem ist die Anbindung wohl schwierig, weil der Anstieg in Richtung Finnland recht steil ist, aber so etwas hat man natürlich an anderen Orten auch bewältigt. So sagte man mir zumindest in Skibotn, dass das Projekt einer Anbindung von Finnland über Skibotn nicht weiter verfolgt werde.

In Kirkenes gibt es bereits einen Hafen und die ersten paar Kilometer der Bahnstrecke, die allerdings auf 1524 mm Spurweite umgebaut werden müsste. Die Anbindung soll östlich oder westlich am Inarisee vorbeiführen, wenn sie gebaut wird. Kirkenes könnte im Gegensatz zu Skibotn auch das Potential für einen geringfügigen Personenverkehr haben, vor allem weil es als Ende der Hurtigroute bereits eine viel besuchte Touristendestination ist.

Schon etwas südlich vom Polarkreis ist vielleicht noch erwähnenswert, dass die parallel zur Ostsee verlaufende Bahnverbindung von Boden nach Haparanda im Jahr 2012 durch eine neue Linienführung erheblich verkürzt wurde. Ein Handicap der schwedischen Bahnen nördlich von Sundsvall ist, dass man sie aus militärstrategischen Gründen weit im Landesinnern gebaut hat und damit die Anbindung der küstennahen Städte mehr schlecht als recht über Stichbahnen gelöst ist. Nun hat man zwischen Sundsvall und Umeå mit der 2010 eröffneten Botniabahn eine eingleisige Hochgeschwindigkeitsstrecke entlang der Küste gebaut und erwägt deren Verlängerung als Nordbotniabahn bis nach Luleå.